Indio City Hall
Magnum’s commercial finishing teams helped deliver the new Indio City Hall and Library, a civic campus in the heart of downtown Indio, California. The City of Indio commissioned a new three-story, 36,285-square-foot City Hall alongside a 7,814-square-foot library, with the two buildings connected by a public plaza. General contractor Tilden-Coil Constructors managed the build, with Holt Architecture leading the design. The project reached completion in April 2026.

A Civic Campus for a Growing City

The City of Indio built the new campus to reinforce its long-term commitments to education, economy, and community engagement. The city broke ground on the new Civic Center Campus on January 17, 2024. The campus sits near College of the Desert and faces the downtown business district, which places City Hall at the center of daily life in Indio.

Design Inspired by the Desert

Holt Architecture modeled the new City Hall on the surrounding desert landscape. The building takes a boulder-like angular form, and angled outdoor balconies cut into the plaza-facing facade to create deep recesses. Angled structural columns break through each floor and visually stitch all three levels together. A striking mid-century modern color palette breaks up the scale of the building at ground level and makes a large government building feel inviting and community-oriented.

CONTRACTOR

Tilden-Coil Constructors

LOCATION

Indio, CA

DESIGNER / ARCHITECT

Holt Architecture

DIVISIONS

Drywall, Acoustical Ceiling, Painting, Wallcoverings & Specialties

Spaces Built for Public Service

The finished Indio City Hall includes a public lobby, open office areas, conference rooms, and City Council chambers. The new council chambers are substantially larger than the previous space, giving residents more room to take part in local government. The library and City Hall share a public plaza that connects the two buildings and gives the community a new place to gather downtown.

Built for Long-Term Service

The project includes a public plaza, enhanced desert landscaping, and a greenbelt across the 134,332-square-foot site. Site work also included parking, a generator, and photovoltaic canopies that generate renewable energy. The PV canopies support the city’s goals to reduce energy consumption and lower its carbon footprint.

Opening the Doors to the Community

The City of Indio celebrated the grand opening on May 20, 2026, with an official ceremony, guided tours of the new building, and light refreshments. The new facilities now give residents welcoming spaces to gather, learn, and connect. Magnum thanks the City of Indio, Tilden-Coil Constructors, and Holt Architecture for their partnership in bringing this civic campus to life.

Project Gallery